moonshot

Your whole footprint, on one screen.

Umbra unifies power, cost, capacity and recommendations for every colocation site you occupy. Built for the tenant paying the bill.

1 / 4

Site overview

Power, cost, capacity and recommendations for each site, the moment it loads. Utilization, stranded capacity in dollars, invoice-verified monthly cost and a renewal countdown, in one view.

Site overview

Sample site

Utilization

14.3 of 29.0 kVA

Invoice-verified cost

$15,734

per month

Stranded capacity

$1,742

per month

  • Cancel redundant circuit$454 / mo
  • Reset draw cap at renewal$1,738 / mo
  • Rebalance feed loadRemoves fault risk

Renewal in 10 months

2 / 4

Cost intelligence

Every dollar traced to a circuit. Invoices reconciled to the cent, cost against consumption per circuit, and the idle spend sitting on capacity you pay for but don’t draw.

Cost intelligence

Sample site

  • Space, cage$5,600
  • Power circuits$6,596
  • Interconnection$1,875
  • Tax$1,663

Cost against consumption, per circuit

Circuit A71% drawn
Circuit B38% drawn
Circuit C6% idle

3 / 4

AI recommendations

Dollarized, evidence-backed recommendations generated from your real metrics. Each one shows the exact data that produced it, a confidence level, and the effort to act — accept, snooze, or dismiss.

Recommendation

High confidence

Cancel redundant 30A circuit

$453.75/ month

Evidence

  • Six-month average draw is 5.8% of contracted capacity.
  • The paired primary feed carries the full load with headroom.
  • The service order can be cancelled at the next cycle.
AcceptSnoozeDismiss

4 / 4

Workflow and observability

Turn a recommendation into a tracked ticket, from open to accepted, ordered, verified and closed, with the dollar value riding along.

Workflow

Sample site

Open

Draw cap reset

Accepted

Cancel circuit

Ordered

Rebalance feed

Verified

Closed

Idle primary
Value in flight$2,192 / month

Umbra’s data sources

Today

  • PDU telemetry

    Read-only SNMP from your power distribution units.

  • Provider power reports

    The Equinix file and similar exports, as they come.

  • Colocation invoices

    Every line mapped to a circuit, cage or cross-connect.

  • Contracts and amendments

    Master agreements, service orders and renewals.

Coming next

  • Network switch SNMP
  • IPMI
  • Environmental sensors
  • Learning across sites

Send us a contract and a few recent invoices.

Within days we’ll show you what we find, before you commit to anything and before any system access.